< previous project
Matrix
YEKATERINBURG
2019
At Innoprom 2019, a kinetic installation for the Russian Copper Company featured moving monitors synchronized with content.

The purpose of RCC was to endorse its global leadership in the copper production chain and put it in the picture through high-tech installations aimed to stun the audience. Matrix is made of fifteen columns - 3.5 meters tall - counting three 32'' monitors each (45 monitors in total); every monitor is individually controlled by a stepper motor that makes it slide up and down on a rail by belt transmission.
"What truly sets LEVA apart is their unwavering commitment to customer satisfaction, evident through their professionalism, transparency, and remarkable customer service. Our partnership with LEVA has been a source of inspiration and has redefined the future of entertainment. "


TECHNICAL DETAILS
PROJECT RELATED INFORMATION
Credits
CLIENT
Russian Copper Company
CONTRACTING
Simmetrico Network
CONCEPT + ART DIRECTION
Simmetrico Network
STRUCTURE CONSTRUCTION
Eurostand
Our Service
MECHATRONICS
PROTOTYPE
FABRICATION
ON SITE SETUP